Pages

Friday, 5 August 2011

ROAD RESURFACING WORK WELCOMED

  Willaston and Rope Cheshire East Councillor Brian Silvester has welcomed the resurfacing of one of the main connecting roads in his Ward. ( See below)

He said, " I am very pleased that the Cheshire East Council is to resurface and strengthen the edge of the carriageway of most of the length of Eastern Road, a road that runs from Willaston to Rope Lane, Rope. We have had two very severe winters and they have taken their toll on our local roads. I have had many complaints about the dangers of potholes  in the surface of the road and I have been pressing for action to be taken. I am  delighted that this resurfacing and carriageway strengthening is taking place. The work will certainly make the road safer to use and the journey will be smoother."


Brian Silvester
Willaston and Rope Ward Councillor

Tel/fax 01270 567757

_____________________________________________

CHESHIRE EAST BOROUGH COUNCIL

NOTICE OF TEMPORARY ROAD CLOSURE

ROAD TRAFFIC REGULATION ACT 1984

EASTERN ROAD, ROPE

NOTICE IS HEREBY GIVEN that the Cheshire East Borough Council, in exercise of its powers under Section 14(2) of the Road Traffic Regulation Act 1984 and of all other enabling powers, issues this notice temporarily to prohibit traffic in the following length of road:- 

1} Eastern Road, Rope from its junction with Rope Hall Lane to its junction with Rope Lane.

The alternative route during the closure will be via; Rope Hall Lane, Rope Lane and vice versa.

The closure is necessary to enable Cheshire East Highways to carry out edge of carriageway strengthening and resurfacing works.

It is anticipated that the works will be carried out on Monday 15th August until Monday 29th August 2011.

Pedestrian access will be maintained at all times.

Vehicular access will be maintained for emergency vehicles and residents.

2} Eastern Road, Rope from its junction with Green Lane to its junction with Rope Lane.

The alternative route during the closure will be via; Wybunbury Road, Cheerbrook Road, Shavington Bypass, Rope Lane and vice versa.

It is anticipated that the works will be carried out on Tuesday 30th August until Thursday 1st September 2011.

Pedestrian access will be maintained at all times.

Vehicular access will be maintained for emergency vehicles and residents.

This notice will become operative on Monday 15th August 2011 for a period of 21 days or for such less time as is necessary to enable the works to be completed.

If you have any enquiries relating to the works please contact Lynne Nixon at Cheshire East Highways on telephone number 0300 123 5020

Monday 15th August 2011  Caroline Elwood                              

Borough Solicitor

                                                Westfields

                                                Middlewich Road

                                                Sandbach

                                                CW11 1HZ

No comments:

Post a Comment